Maintenance
Know which machine is down and what it costs you
Anyone can report a breakdown from their screen or from the shop-floor terminal. Maintenance handles it with a work order, and preventive plans open their own.
What's included
-
Equipment and vehicles
Machines, vehicles and trailers linked to their work center, vehicle or fixed asset, with no double entry.
-
Breakdown reports
Operators report them from the shop-floor terminal. If the machine stopped, downtime counts from that moment.
-
Work orders
Preventive, corrective or breakdown, with technicians, a checklist, hours and spare parts.
-
Preventive plans
Every so many days, kilometers or hours, whichever comes first. The order opens on its own, ahead of time.
-
Meters
Kilometers for vehicles and hours for machines. Machine hours come straight from what each section worked on the shop floor (MES).
-
Cost and availability
Cost per unit, breakdowns with MTBF and MTTR, and preventive compliance.
A machine that's down shows up across Nori
While a unit is out of service, the other modules know it.
-
Shop floor
The board and the terminal show the section as stopped.
-
Routes
A truck in the shop isn't offered or assigned to a route that day.
-
Shipments
No shipment gets scheduled with an out-of-service vehicle on that date.
-
Scheduling
Production scheduling takes out the time for preventive work and breakdowns.
With SAP Business One or NetSuite
Work orders, plans and meter readings live in Nori. The documents they create post to your ERP like any other.
- Posts: goods issues for spare parts, and purchase requests or orders for outside services.
- Stays in Nori: equipment, plans, work orders and meter readings.
License
Technicians use a Logistics license with the Maintenance technician role, without seeing costs. The Maintenance manager uses Supervisor. Most operations roles can report a breakdown.
PricingFrequently asked questions
How is a work order posted?
With Nori's accounting, parts and labor go to maintenance expense with the unit's cost center.
Can I send a unit to an outside shop?
Yes. From the order, create the purchase request or order for the service, and it follows the normal purchasing cycle.
What if a machine breaks down mid-shift?
The operator reports it at the terminal, and the section shows as stopped on the shop-floor board until the machine runs again.
See the module with your own data
In the demo we walk through your chart, your documents and how to get started.