Production scheduling (APS)

What each machine does, in what order and when it finishes

Nori fits your orders' operations into each section's shifts. It tells you which order will be late, what material is missing and when you can promise an order to a customer.

Request a demo

What's included

  • Plant calendar

    Shifts per day, machines working at once and each section's efficiency. Closed days and holidays aren't scheduled.

  • Maintenance downtime

    A scheduled preventive job or a machine stopped by a breakdown leaves that machine without capacity while it lasts.

  • Gantt per machine

    One row per machine and one bar per operation. Overlaps and operations starting without material show in red.

  • Move and lock

    Drag an operation to another time or another machine in the section and it gets locked. When you reschedule, the rest fits around it.

  • Scenarios

    Each run is saved as a draft. Compare two and publish one as the official schedule.

  • Materials and shortages

    An order doesn't start before there's stock, the purchase arrives or the component's order finishes. If nothing covers it, it's flagged with a shortage.

  • Late orders

    Each order with its due date, when it finishes and how many days late, plus the sections that won't keep up in the next four weeks.

  • When can I deliver?

    Enter the product and quantity, or pick a sales order, and Nori gives you the date from the plant's actual load. Nothing is saved.

The plant follows the published schedule

Once you publish a scenario, the terminal, the board and the orders use it.

  • Shop floor terminal

    Each section's list follows the scheduled sequence, with the shift and time of each operation.

  • Plant board

    Each card shows scheduled against actual time and flags what's behind schedule.

  • Production order

    Its operations show scheduled and actual times.

  • With today's progress

    When you reschedule, only what's left counts. If 30 of 50 units are done, 20 get scheduled.

With SAP Business One or NetSuite

The schedule lives in Nori and isn't sent to SAP Business One or NetSuite. It creates no documents, moves no inventory and posts no entries.

See integrations

License

Planners use a Supervisor license with the Production or Production planner role. A Logistics license only views the schedule, like the shop floor terminal, which follows the published sequence.

Pricing

Frequently asked questions

Forward or backward?

Both. Forward starts each order as soon as possible. Backward finishes it right on its due date, and if it doesn't fit, Nori schedules it forward and flags it.

How does it decide what goes first?

Components first, then priority and due date, or due date first if you choose. The same data gives the same result. If you want a different order, move the operation and lock it.

Can I group orders for the same product?

Yes. With Group setups, orders for the same product due the same week run back to back and don't repeat the machine setup.

Are MRP planned orders included?

Yes, if you tick Include planned orders when scheduling.

Can I ask the assistant?

Yes. For example, "which orders are late?", "what's the bottleneck?" or "when can I deliver 40 units?".

See the module with your own data

In the demo we walk through your chart, your documents and how to get started.

Request a demo