How to inspect what you receive: plans, inspection lots and the decision
Define what to check of each item, hold what arrives until it is inspected, and decide what is accepted, returned to the vendor, scrapped or reworked.
Updated November 17, 2026
On this page
With Quality, what you receive of an item with an inspection plan is not sold or used until someone checks it and decides. It works with goods receipts PO, receipts from production and customer returns.
1. Create the inspection plan
- Go to Quality › Setup › Inspection plans and press New.
- Choose an Item or an Item group. The item's plan wins over its group's, and subgroups inherit the plan of the group above.
- Tick where it is inspected: Goods receipt PO, Receipt from production, Customer return or Before delivering to the customer.
- Choose the Sampling: the whole lot, a fixed number of units or a percentage.
- Add the Characteristics:
- Measurement: with minimum, target, maximum and unit (for example, moisture from 0 to 14 %).
- Pass / fail: a visual or functional check.
- Text: a remark that does not decide the result. Mark as Critical the one that, if it fails, makes the lot fail.
Each change raises the plan's version. Lots already open keep the characteristics they copied.
2. What is received is held
When you save the goods receipt (or the receipt from production, or the return) of an item with a plan, Nori:
- Opens an inspection lot per line, with its vendor or customer, its batch and the sample to check.
- Moves the quantity to the quality warehouse with a transfer. That warehouse does not sell: nothing is invoiced, delivered or rung up at the POS from it, and nothing leaves it by hand.
Open lots are in Quality › Inspection lots. You can also open one by hand with New lot, for goods already in a warehouse.
Why: like SAP's quality control warehouse, held stock is still yours and keeps its value, but it cannot be sold by mistake.
3. Record the results
Open the lot, type the value of each characteristic and press Save results. Nori marks Conforms or Does not conform against the limits, and the lot is Passed once every one is recorded, or Failed as soon as a critical one fails.
4. Decide
In Usage decision split the lot's quantity:
- Accept: goes back with a transfer to the warehouse it was received in and can be sold or used.
- Return to vendor: a goods return copied from the receipt, at the same price. Only what is not yet invoiced goes back; once invoiced, the vendor credits it with a credit memo.
- Scrap: leaves with a goods issue booked to the Quality losses account.
- Rework: Nori creates a special production order that takes the rejected goods from the quality warehouse. When it is received, if the plan applies to receipts from production, it is inspected again.
The quantities must add up to the lot. If the lot failed and you accept something, write why in the notes (concession). Who decided and when is recorded. If you tick Open a nonconformance, its nonconformance opens with the vendor and the rejected quantity.
If a lot was opened by mistake, Cancel lot puts the goods back in their warehouse. While the lot is open, the receipt that opened it cannot be cancelled.
Before delivery
With Before delivering to the customer, every order of the item opens a lot that does not move the goods. The delivery or invoice of that order cannot carry more than the lot accepted.
Certificate of analysis
On a decided lot with an inventory batch press Certificate of analysis: a PDF with the product, batch, expiry, each characteristic with its specification and the value found, and who inspected and approved it. Its layout is changed in the layout designer. If you turn on Send certificates of analysis with the delivery in Quality › Settings, the e-mail of the delivery or invoice carries one for each accepted batch it delivers.
Settings
In Quality › Settings you choose the Quality warehouse (if none, Nori creates "CALIDAD"), the Causality of scrap and whether each rejection opens its nonconformance. With an ERP connected choose a warehouse that exists in the ERP; until you do, lots open without holding the goods.
Permissions
The Quality inspector role opens lots, records results and raises nonconformances. The Quality manager also decides and keeps the plans. See roles and permissions.
Common problems
- "What is in Quality waits for its inspection": someone tried to move held goods by hand. Decide the lot.
- The return to the vendor failed: the receipt was already invoiced. Scrap or rework, and ask for the credit memo.
- No lot opened: check that the plan is active and has that kind of receipt ticked.