Skip to content
Browse topics

Shop-floor board: progress, scrap, efficiency and load

See on one screen what is in each section, who is working, today's output, scrap, efficiency and whether the load of the coming days fits the capacity.

Updated November 17, 2026

On this page

The shop-floor board is the supervisor's screen. Go to Production › Shop-floor board.

The figures at the top

  • In progress: the open operations of released orders and how many people are working right now.
  • Today: the good pieces reported today, and how many were scrapped.
  • Scrap: scrapped pieces against all pieces reported in the last 7 days.
  • Efficiency: the standard minutes of what was made against the actual minutes operators recorded. Over 100 % means the work went faster than the routing's standard.
  • Late: open operations of orders whose due date has passed.

By section

Each column is a section with its open operations. Each card shows the order, the product, how much is done, what is available to work on and who is working on it. Late cards are marked in red. Tap the order number to open it.

Load

The Load view shows, per section and per day, the hours still pending from planned and released orders against the section's daily capacity. Nori lays out the work from today, one operation after another following the routing, skipping Sundays. You can look at the next 7, 14 or 21 days. Days in red go over capacity: move dates, add a shift or split the work.

Why: the load is a guide, not a fixed schedule. It does not consider holidays or capacity already taken by other orders on the same day.

Related articles

Can't find something?

Tell us what you need to do and we'll get back to you. If you're already a customer, include your company's name.

Contact us